How Do I Prepare Older Cabinets for New Stone Countertops

Most people book the countertop install and never look at whether the base cabinets can carry a slab. Before anyone calls for a template in Lexington, KY, the boxes have to be level, square and screwed to the wall and to each other, and the checklist sitting on countertops lexington book js lists those steps in order. Stone does not flex the way laminate does, so every low spot in the cabinet run becomes a stress point.
Check the cabinets before anything else

Run a straightedge and a level across the tops of the base cabinets, front to back and end to end. Shims handle small low spots. They do not fix everything. A settled floor or a sagging cabinet box can leave a dip too large to shim, and a slab bridging that gap on a few shims has an unsupported span that cracks later. Correct the dip first. No cabinet should be assumed ready for granite, quartz or quartzite without being looked at.
Fasten the run into one structure

Each box gets screwed into wall studs and clamped and screwed to its neighbor through the face frames. A loose cabinet shifts under the weight of a slab, and the seam between two pieces opens up. Seam placement is picked around the sink and cooktop, so the cabinets under those spots matter most.
Pick the sink, faucet and cooktop first
The fabricator cuts the openings from the template, so the fixtures have to be chosen before that visit. Undermount sinks are often needed on site so the cutout can be matched to the bowl. The faucet hole count and cooktop model decide where the cuts land. Edge profile and overhang get settled at the same time, whether that is an eased edge, a bullnose or a waterfall edge on an island end.
Template only after the cabinets are in
Templating records the exact final cabinet layout, so it happens after the base cabinets are fully installed. Templating early means the slab gets cut to a layout that no longer exists. A remnant can cover a small vanity or bar top, but a full kitchen is cut from the measured template, with no guessing at the wall.
Demolition and the old top
Test the water shutoff valves under the sink before demolition. Older valves sometimes fail to close fully, and that is a bad thing to learn with the supply line already off. Tearing out tile or a mortar bed top is heavy work and can crack face frames or pull cabinet tops loose, so recheck the cabinets once the old top is gone. Where stone replaces laminate, a dishwasher that was screwed to the underside of the old top usually needs side mounting brackets fastened to the adjacent cabinets.